Ground breaking addition for Rolled Alloys Fairfield in Ohio being built by M Lichtenberg & Sons.
Expansion of an existing 65,500sf building M. Lichtenberg & Sons designed and built in 2007.
Includes a 40,000sf warehouse addition & 5,000sf office addition.
Includes an 80’ bridge crane extension into the new addition.
Includes a 350’ long retaining wall 18’ tall to hold back the existing hillside allowing room for the warehouse expansion.
Construction will be complete by 12-31-19.
PROJECT DETAILS
Rolled Alloys Project
- Type: Pre-Engineered Steel
- Total Cost: $3,320,000
- Duration: 8 Months
- Client: Rolled Alloys
Ground breaking addition for Rolled Alloys Fairfield in Ohio being built by M Lichtenberg & Sons.
Expansion of an existing 65,500sf building M. Lichtenberg & Sons designed and built in 2007. Includes a 40,000sf warehouse addition & 5,000sf office addition.
An 80’ bridge crane extension built into the new addition, with a 350’ long retaining wall 18’ tall to hold back the existing hillside allowing room for the warehouse expansion.