Ground breaking addition for Rolled Alloys Fairfield in Ohio being built by M Lichtenberg & Sons.

Expansion of an existing 65,500sf building M. Lichtenberg & Sons designed and built in 2007.

Includes a 40,000sf warehouse addition & 5,000sf office addition.

Includes an 80’ bridge crane extension into the new addition.

Includes a 350’ long retaining wall 18’ tall to hold back the existing hillside allowing room for the warehouse expansion.

Construction will be complete by 12-31-19.

This entry was posted in Commercial ConstructionDesign / Build Commercial ConstructionGround Breaking Construction. Bookmark the permalink.

PROJECT DETAILS

Rolled Alloys Project

  • Type: Pre-Engineered Steel
  • Total Cost: $3,320,000
  • Duration: 8 Months
  • Client: Rolled Alloys

Ground breaking addition for Rolled Alloys Fairfield in Ohio being built by M Lichtenberg & Sons.

Expansion of an existing 65,500sf building M. Lichtenberg & Sons designed and built in 2007. Includes a 40,000sf warehouse addition & 5,000sf office addition.

An 80’ bridge crane extension built into the new addition, with a 350’ long retaining wall 18’ tall to hold back the existing hillside allowing room for the warehouse expansion.